GH15 Ventures wins Pek Chuan Building tender with $80.68 mil bid

Firm files suggest that GH15 Ventures is an investment vehicle of GH15 Investments, a firm registered to operate hostels and dormitories for college students, workforces and others. Its executive officer is Stephen Goh.

Refurbishment has repaid for a comparable building. Mount Everest Properties offered GSM Building on Middle Road to Coliwoo for $80 million in 2023. After a major repair, the building, now called Coliwoo Midtown, is being obtained by CapitaLand Ascott Trust for $134 million under a deal announced in August.

Springleaf Residence Guocoland & Hong Leong Group

The buyer can apply to URA for an improvement of use to a hotel or mixed-use development. If it opts for asset enhancement instead, Loi expects the structure to bring in offices and F&B businesses displaced by the 2027 redevelopment of Marina Square and Valley Point. He likewise anticipates “strong support” from upcoming residential developments in Kallang and Boon Keng.

The location has 28,700 sq ft of land and is zoned commercial, with a plot ratio of 2.5 and a height restriction of 12 storeys. At the allowable gross floor location of 71,750 sq ft, the price works out to $1,124 psf per plot proportion (ppr), omitting any kind of land improvement cost and lease top-up premium. The site gets on a 99-year contract that commenced in 1978, leaving approximately 51 years.

The deal was agented by Terry Wong, head of capital markets and investment sales at Colliers Singapore, who represented the buyer GH15 Investments.

GH15 Ventures has actually won the combined sale tender for Pek Chuan Building at 116 Lavender Road with an $80.68 million bid.

The existing four-storey structure has retail space on the first three floors and offices on the fourth. It is about 50m from Bendemeer MRT Terminal on the Downtown Line and within strolling range of Lavender MRT Terminal on the East-West Line. Loi describes it as the lengthiest standalone commercial property with a full frontage along Lavender Street.

The public tender closed on Oct 7 and attracted 3 bids, says Dillon Loi of Mount Everest Properties, the advertising representative. The winning proposal is 4.8% over the $77 million requesting cost set when the building was relaunched to sell in September. It even tops the $80 million guide cost for its initial 2 attempts at a cumulative sale in October 2025 and March 2026. Both tenders shut without a successful bid.


error: Content is protected !!